Tuesday, April 23, 2013

Bathroom Transformation in Progress - What do you think?

To continue from yesterday's post on the start of a new bathroom project, I stopped by the job site and a lot  has changed :)

Before I get into the nitty-gritty, I can't resist sharing how beautiful the surroundings are of this home. Extra beautiful on a lovely spring day!



Before:
 



















Now: All cabinetry, soffit and the doorway has been removed.
Drywall replaced and new wiring for the new sconces
The wall with the doorway is now a half wall and a pipe that was discovered in the wall will be made into a decorative column to visually divide the two spaces while allowing it to be more open and feel larger.


A lot of the wallpaper has been removed and the ceilings are down to allow for new wiring and positioning of the new light fixtures.
       

The tub area still has room for improvements but the lowered ceiling over the tub was raised with a new recessed fixture in place. The blue tile will come off eventually ... only to be replaced with more blue tile ;)



Well, that's all for now! Later this week the new tub, heated floors and marble basketweave tile is going in so I'll be sure to keep you updated on the progress. I can't wait to see this one come to LIFE!

No comments:

Post a Comment